WebBituthene® Protection Board Sub-structure Assembly 040-013-1254 • Elevated or grade level podiums • Plaza decks / Roof gardens / Terraces Installation Measures should be taken to ensure that all surfaces are free from ice, frost or condensation. Roof slab surfaces must be dry, and WebJun 4, 2013 · Bituthene. Protection. Board. Bituthene LM. the effects of water, damp and gas penetration. Also, Bituthene 8000 / 8000 HC Waterproofing. Membrane is suitable for flat decks such as inverted. roofs, elevated or grade level podiums or plaza. decks as the reduced solar gain is an advantage. Water and moisture proof Provides protection for …
Protection Board - PROTECTION COURSE …
WebTo locate boards, prime five 150 mm x 150 mm ‘patches’ (one in each corner, and one in the middle) of each board with suitable GCP Primer and allow to dry. Apply BITUSTIK™ … WebThis semi rigid board is designed for use in both horizontal and vertical applications to protect Bitusheet XL, Bitusheet Gas Barrier Membrane or Dual Seal Membrane against abrasive backfill, poured concrete or foot traffic. Its composition contains blended bitumens and minerals reinforced with cellulose fibres that are heavily compressed. litmangerson associates
Bituthene 4000 Self-adhesive HDPE waterproofing …
WebSERVIDEK® is a unique two component polymer modified bitumen, liquid waterproofing membrane. Cold applied by squeegee or trowel, the mixed liquid cures chemically to form a seamless, elastomeric waterproofing membrane for concrete and steel bridge and trafficked decks. SERVIPAK® protection boards are robust, bitumen impregnated boards, … WebProtect BITUTHENE® membranes immediately after application to avoid damage from other trades, construction materials or backfill, using only Protection 03 boards. If the area around the substructure can be … WebApr 3, 2024 · Bituthene LM. Waterproof continuity at angles and at penetrations is provided by Bituthene LM two-component, chemically-curing, liquid-applied waterproof membrane.. Bituthene Protection Board. Damage from following trades and backfill is prevented by Bituthene Protection Boards. Located with BitustikTM 4000 double-sided tape. Product … litman gregory mutual funds